Structural Steel Erection

When do you need steel?

Steel is called out by the engineer on the structural section of your plans. The engineer calls out each metal beam starting with the letter W_. A column schedule can also be found on the first page of your plans

How is price determined?

Price for steel increases according to weight. Asking the engineer to use a smaller beam or replacing small metal items with wood can save alot of money. Job complexity is also a big factor. If the steel is going to be placed higher than 10ft a skytrak is required. Certain hard to reach members may require a crane, resulting in a higher overall cost for installation. 

When is the best time to order Steel?

Conventional steel is generally available within 1 or 2 business days. 1 or 2 weeks may be required for special order items direct from the mill. 